Machine & configuration listModel per process step, optional equipment and the non-standard items in scope.
Cycle-time calculationTheoretical output from the bottleneck, plus a 15–20% headroom recommendation.
Tooling planNumber of tools for your cup or box sizes, changeover time and quick-change design.
Trial reportRun with your board or product, recording temperature, pressure, yield and cycle time.
Site requirementsFootprint, air consumption, installed power and floor loading.
Delivery & trainingArrival, installation, commissioning, operator training and the spare-part list.